Travelers Information Service – (TIS)
Determine the best location for the transmission site
Provide spectrum study to determine operating frequency
File applicable FCC and FAA documents
Assist in defining system needs
Develop the plan for the installation of the proposed facility
Supervise the antenna installation and tune the antenna
Conduct the required FCC field Intensity measurements
File the Installation Report with the FCC
Compile all documentation and provide instruction to the operators
Low Power Broadcasting
System Planning
On Site Visitation
Complete measurement and final system compliance adjustments
Provide system certification and documentation
Broadcast Audio
Specialist in program level metering and control.
CONTACT
BURDEN ASSOCIATES
20944 Sherman Way,
Canoga Park, CA 91303
818-340-4590
|